• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTRUMENT CLUSTER INSTALLATION
MACHINE ELECTRONIC CONTROL MODULE (ECM) REPLACEMENT

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
TM 5-3805-290-23-2
INSTRUMENT CLUSTER AND TURNLAMP SWITCH REPLACEMENT - CONTINUED
0051 00
ACTION ALARM INSTALLATION
1.
Install action alarm (15) in duct (16) and secure with
washer (14) and nut (13).
2.
Connect wire (12).
3.
Install instrument cluster. Refer to Instrument Cluster
Installation in this work package.
427-B2116
TURNLAMP FLASHER REMOVAL
0051 00
1.
Remove instrument cluster. Refer to Instrument
Cluster Removal in this work package.
2.
Disconnect wiring harness (17).
3.
Remove two screws (18) and flasher (19).
TURNLAMP FLASHER INSTALLATION
1.
Install flasher (19) and two screws (18).
2.
Connect wiring harness (17).
3.
Install instrument cluster. Refer to Instrument Cluster
Installation in this work package.
427-B0892-1
END OF WORK PACKAGE
0051 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.