TILT LINK INSTALLATION - CONTINUED
LIFT ARMS REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1181    1182    1183    1184    1185  1186  1187    1188    1189    1190    1191  
img
. . . . . . . . . . . . . . . . . . . . .
14
TM 5-3805-290-23-2
LIFT ARMS REPLACEMENT
0201 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Materials/Parts - Continued
Maintenance Level
Direct Support
Tag, marker (Item 54, WP 0206 00)
Tools and Special Tools
Bearing sleeve (4)
Tool kit, general mechanic's (Item 96, WP 0205 00)
O-ring (8)
Shop equipment, machine shop, field maintenance,
Seal (8)
heavy, less power (Item 76, WP 0205 00)
Jack stand
Personnel Required
Lifting equipment, 1,850-lb capacity
MOS 62B, Construction Equipment Repairer (2)
Shims
Equipment Conditions
Wood block, 4 x 4
Steering frame lock connected (TM 5-3805-290-
Materials/Parts
10)
Cap set, protective (Item 8, WP 0206 00)
Bucket removed (TM 5-3805-290-10)
Cleaning compound, solvent, type III (Item 9, WP
Quick coupler removed (WP 0198 00)
0206 00)
Grease, molybdenum (Item 23, WP 0206 00)
Front lever and link assemblies removed (WP 0199
00)
Oil additive, hydraulic (Item 31, WP 0206 00)
Oil, lubricating, OEA-30, Arctic (Item 32, WP
Tilt cylinder removed (WP 0128 00)
0206 00)
Drawings Required
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
00)
TM 5-3805-290-23P, Figure 172
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
Estimated Time to Complete Task
0206 00)
Rag, wiping (Item 41, WP 0206 00)
7.0 hr