• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION TEST LINES AND FITTINGS REPLACEMENT
TRANSMISSION TEST LINES AND FITTINGS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  250    251    252    253    254  255  256    257    258    259    260  
img
TM 5-3805-291-23-2
TRANSMISSION TEST LINES AND FITTINGS REPLACEMENT - CONTINUED
0106 00
C AU T I O N
Wipe area clean around all connections to be opened during removal. Cap lines and hoses and plug open-
ings after removing lines. Contamination of system could result in premature failure.
N OT E
Tag hoses prior to removal to ensure correct installation.
Use a container to catch any fluid that may drain from hoses or system. Dispose of fluid IAW local pol-
icy and ordinances. Ensure all spills are cleaned up.
REMOVAL
1.
Disconnect six lines (1) from elbows (2). Remove and discard six O-rings (3).
2.
Remove six elbows (2) from fittings (4). Remove and discard six O-rings (5).
3.
Remove six fittings (4) from machine. Remove and discard six O-rings (6).
4.
Remove all associated tie straps (7) and clips (8). Discard tiedown straps.
427-C1359
0106 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.