• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT COVER REPLACEMENT - CONTINUED
INTAKE/EXHAUST VALVE LASH ADJUSTMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  819    820    821    822    823  824  825    826    827    828    829  
img
. . .
TM 5-3805-291-23-2
FRONT COVER REPLACEMENT - CONTINUED
0178 00
INSTALLATION
1.
Position new gasket (6) and front cover (3) on front housing (7).
2.
Install two washers (5) and studs (4) on front cover (3).
3.
Install 18 washers (2) and bolts (1) on front cover (3).
4.
Install front main seal (WP 0174 00).
5.
Install accessory mechanism (WP 0194 00).
6.
Install fuel transfer pump (WP 0188 00).
7.
Run engine until normal operating temperature is reached (TM 5-3805-291-10).
8.
Shut down engine (TM 5-3805-291-10).
9.
Check for leaks.
END OF WORK PACKAGE
0178 00-3/(0178 00-4 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.