MAIN HYDRAULIC CONTROL VALVE INSTALLATION - CONTINUED
MAIN HYDRAULIC CONTROL VALVE INSTALLATION - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1147    1148    1149    1150    1151  1152  1153    1154    1155    1156    1157  
img
TM 5-3805-291-23-2
MAIN HYDRAULIC CONTROL VALVE REPLACEMENT - CONTINUED
0218 00
MAIN HYDRAULIC CONTROL VALVE INSTALLATION - CONTINUED
12.
Install six new O-rings (21) in eight tube assemblies
(19) and connect tube assemblies to main hydraulic
control valve (20).
13.
Install 12 flange halves (18), 24 washers (17), and
bolts (16) on main hydraulic control valve (20).
14.
Install two new O-rings (15) on tube assemblies (14).
15.
Install eight washers (13) and bolts (12) on two tube
assemblies (14).
427-C1106
16.
Position cover plate (11) on machine and install two
washers (10) and bolts (9).
17.
Install two rubber covers (8) on machine.
18.
Install plate (7), three washers (6), and nuts (5) on
machine.
19.
Install two plates (4), eight washers (3), and bolts (2)
on machine.
427-C1105
0218 00-12