TM 5-3805-292-10
0020
Table 1. Preventive Maintenance Checks and Services (PMCS)
for the M400T and M400W SSL - Continued.
LOCATION
ITEM TO
CHECK/
ITEM
MAN-
NOT READY/
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
AVAILABLE IF:
39
After
Overall View
a. Check on ground under
Class III oil leaks are
evident.
machine for evidence of oil
leakage.
b. Inspect machine for obvious
Damage that would impair
damage that would impair
operation is evident.
operation.
c. Inspect lift/tiedown and sling
Damage that would impair
operation is evident, if
guide weldments for cracks or
required for mission.
breaks.
40
After
Tilt Cylinders
a. Inspect tilt cylinders for damage Damage or looseness is
evident.
and Hydraulic
and security of mounting.
Lines
b. Check for looseness or leaks in Looseness or Class III
leaks are evident.
hydraulic tubes, hoses, and
fittings.