TM 5-3805-292-10
0020
Table 1. Preventive Maintenance Checks and Services (PMCS)
for the M400T and M400W SSL - Continued.
LOCATION
ITEM TO
ITEM
MAN-
NOT READY/
CHECK/
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
AVAILABLE IF:
After
Batteries
b. Inspect batteries, battery cables,
Battery case is cracked or
50
there is evidence of
(Cont)
and holddown. Ensure
electrolyte leaks or cables
holddown and cable
or connectors are
connections are tight and
damaged.
batteries are clean and dry.
c. Ensure battery equalizer is
Battery equalizer
damaged or not securely
securely mounted with no
mounted.
evidence of damage.
458-1366
Figure 36. Battery Installation and Equalizer.
0020
d. Close and secure cover plate
with three tamper resistant bolts,
then return wrench to pouch