Table 2. Preventive Maintenance Checks and Services (PMCS) for the Work Tool Attachments.
Table 2. Preventive Maintenance Checks and Services (PMCS) for the Work Tool Attachments - Continued.

Operators Manual For M400T And M400W
Page Navigation
  200    201    202    203    204  205  206    207    208    209    210  
img
TM 5-3805-292-10
0020
Table 2. Preventive Maintenance Checks and Services (PMCS)
for the Work Tool Attachments - Continued.
LOCATION
ITEM TO
CHECK/
ITEM
MAN-
NOT READY/
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
AVAILABLE IF:
4
a. Inspect hydraulic hammer kit for Cracks, damage, loose or
Before
0.1
Hydraulic
missing fasteners, or
Hammer
cracks, damage, loose or
missing fasteners, and broken  broken welds are evident.
welds.
b. Inspect hydraulic hose
Damage that would cause
Class III leaks is evident.
assemblies for cracks, brittle
covers, or other damage.
c. Apply 10 shots of GAA grease
to grease fitting.
GAA
458-0043
Figure 56. Hammer Grease Fitting.
0020
5
During
0.1
Hammer
Every 2 to 3 hours of operation,
apply 10 shots of GAA grease to
grease fitting.
6
After
Bucket
a. Clean bucket
b. Check for bends, cracks, and
Damage that would impair
operation is evident.
broken welds.
c. Inspect hydraulic hose
Damage that would cause
Class III leaks is evident.
assemblies for cracks, brittle
covers, or other damage.
0020-65