TM 5-3805-292-23
0075
INSTALLATION CONTINUED
4. Torque eight bolts (Figure 5, Item 1) to an initial torque of 50 to 120 lb-ft (67 to 163 Nm) in pattern shown.
5. Torque eight bolts (Figure 5, Item 1) to a final torque of 208 to 235 lb-ft (285 to 320 Nm) in pattern shown.
Figure 5. Torque Sequence.
0075
6. Lower track (Figure 6, Item 1) onto machine and remove lifting device (Figure 6, Item 2).
Figure 6. Track Installation.
0075
END OF TASK