4
TM 5-3805-292-23
FIELD MAINTENANCE
-
BACKUP ALARM PRESSURE SWITCH REPLACEMENT
0
140
REMOVAL, CLEANING AND INSPECTION, INSTALLATION
INITIAL SETUP
References
Tools and Special Tools
0
0
TM 5-3805-292-10
0
33)
TM 5-3805-292-23P, Figure 69
0
0
0
Equipment Conditions
0
Materials/Parts
0
0
Cleaning Compound, Solvent, Type III (WP
0
0
Estimated Time to Complete
0
0
0.8 Hr
0
0
O-Ring (2)
0
REMOVAL
000140
N OT E
Tag wires and electrical connectors to aid in installation.
1. Disconnect wiring harness (Figure 1, Item 5) from switch (Figure 1, Item 1) and remove switch from machine.
2. Disconnect wiring harness (Figure 1, Item 2) from switch (Figure 1, Item 3) and remove switch from machine.
3. Remove and discard two O-rings (Figure 1, Item 4).
Figure 1. Backup Alarm Pressure Switch.
0140
END OF TASK