TM 5-3805-292-23
0161
REMOVAL
000161
N OT E
Tag and identify cables, wires and terminals for ease of installation.
1. Remove three small nuts (Figure 1, Item 2), and three wire terminals (Figure 1, Item 3) from grid heater relay
(Figure 1, Item 8) and starter relay (Figure 1, Item 6).
2. Remove push-on terminal (Figure 1, Item 7) from grid heater relay (Figure 1, Item 8).
3. Slide four rubber boots (Figure 1, Item 1) back off four red cables (Figure 1, Item 4).
4. Remove four nuts (Figure 1, Item 5), and four red cables (Figure 1, Item 4) from grid heater relay (Figure 1,
Item 8) and starter relay (Figure 1, Item 6).
5. Remove four nuts (Figure 1, Item 10), washers (Figure 1, Item 9), grid heater relay (Figure 1, Item 8), starter
relay (Figure 1, Item 6), and four bolts (Figure 1, Item 11) from machine.
Figure 1. Grid Heater and Starter Relays.
0161
END OF TASK
CLEANING AND INSPECTION
000161
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0172).
END OF TASK