• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 27. Pump Cutoff Pressure Adjustment.
Figure 29. Piston Pump Pressure Connection.

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  348    349    350    351    352  353  354    355    356    357    358  
img
.
TM 5-3805-298-23-2
0166
PUMP STANDBY PRESSURE TEST CONTINUED
CAUTION
When servicing this machine, performing maintenance, or disposing of hazardous
materials, consult your unit/local hazardous waste disposal center or safety office for local
regulatory guidance. If further information is needed, please contact the Army
Environmental Hotline at 1-800-327-3845.
Do not perform this procedure unless directed here from troubleshooting or a repair
procedure. Failure to follow this caution may result in an improper diagnosis.
1. Apply sealant on threads of 580 psi (4,000 kPa) gauge (Figure 28, Item 1) and a 6V-3966 valved nipple
(Figure 28, Item 3) from pressure gauge kit.
2. Install adapter (Figure 28, Item 4) on 580 psi (4,000 kPa) gauge (Figure 28, Item 1).
3. Install 6V-3966 valved nipple (Figure 28, Item 3) on adapter (Figure 28, Item 4).
4. Connect hose 177-7861 (Figure 28, Item 2), from pressure gauge kit, to 6V-3966 valved nipple
(Figure 28, Item 3).
Figure 28. 580 psi (4,000 kPa) Gauge Assembly.
0166
0166-31


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.