• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 26. High-Pressure Purge.
HYDRAULIC TESTS, INSPECTIONS, AND ADJUSTMENTS

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1062    1063    1064    1065    1066  1067  1068    1069    1070    1071    1072  
img
TM 5-2420-231-23-1
0085
FUEL SYSTEM PRIME PROCEDURE CONTINUED
WARNING
When servicing this machine, performing maintenance, or disposing of materials such as
engine coolant, hydraulic fluid, lubricants, battery acids or batteries, and CARC paint,
consult your unit/local hazardous waste disposal center or safety office for local regulatory
guidance. If further information is needed, please contact The Army Environmental Hotline
at 1-800-327-3845.
7. Clean spilled fuel from machine. Dispose of fuel IAW unit SOP.
END OF TASK
END OF WORK PACKAGE
0085-19/(20 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.