• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 20. Fuel Injection Pump Timing Plug.
Figure 23. Foot Throttle Cable Adjustment.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1057    1058    1059    1060    1061  1062  1063    1064    1065    1066    1067  
img
.
TM 5-2420-231-23-1
0085
CHECKING FUEL INJECTION PUMP TIMING CONTINUED
23. Rotate engine approximately 1/4 turn clockwise.
24. Install low-pressure fuel pump (WP 0149).
25. Install fuel filter with water separator (WP 0147).
26. Remove two starter bolts (Figure 22, Item 1) and engine turning tool (Figure 22, Item 2) from engine
(Figure 22, Item 3).
Figure 22. Engine Turning Tool.
0085
27. Install starter (WP 0152).
END OF TASK
0085-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.