TM 5-2420-231-23-1
0086
LOADER RELIEF TEST CONTINUED
7. Remove cap (Figure 9, Item 1), two screws (Figure 9, Item 3), and screen (Figure 9, Item 4) from hydraulic
reservoir (Figure 9, Item 5).
8. Insert outlet hose (Figure 9, Item 2) until it touches bottom of hydraulic reservoir (Figure 9, Item 5) and secure
hose in place.
Figure 9. Hydraulic Reservoir.
0086
9. Connect inlet hose (Figure 10, Item 1) and outlet hose (Figure 10, Item 2) to flowmeter (Figure 10, Item 3).
Figure 10. Flowmeter Connections.
0086