• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GRID HEATER POWER CABLE AND GRID HEATER CONTROL ASSEMBLY REPLACEMENT
Figure 5. Controller Connector.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  477    478    479    480    481  482  483    484    485    486    487  
img
.
TM 5-2420-231-23-2
0160
REMOVAL CONTINUED
NOTE
Tag and mark wires to aid in installation.
2. Remove nut (Figure 2, Item 3) and washer (Figure 2, Item 4), and disconnect grid heater power cable
(Figure 2, Item 1) from relay (Figure 2, Item 2).
Figure 2. Relay.
0160
3. Remove nut (Figure 3, Item 2) and disconnect grid heater power cable (Figure 3, Item 3) from grid heater
(Figure 3, Item 1). Remove grid heater power cable from machine.
Figure 3. Grid Heater.
0160
0160-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.