• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Relay Mount.
Figure 11. Grid Heater.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  482    483    484    485    486  487  488    489    490    491    492  
img
.
TM 5-2420-231-23-2
0160
INSTALLATION CONTINUED
Figure 9. Controller Connector.
0160
14. Install bolt (Figure 10, Item 3), new lockwasher (Figure 10, Item 4), and clamp (Figure 10, Item 7) on mounting
plate (Figure 10, Item 2).
15. Install two bolts (Figure 10, Item 3) and new lockwashers (Figure 10, Item 4) on mounting plate
(Figure 10, Item 2).
16. Install three spacers (Figure 10, Item 5) and new O-rings (Figure 10, Item 6) on bolts (Figure 10, Item 3).
17. Position mounting plate (Figure 10, Item 2) on bulkhead (Figure 10, Item 1) and tighten three mounting bolts
(Figure 10, Item 3).
Figure 10. Mounting Bolts.
0160
0160-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.