• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Relay Sockets.
Figure 8. Main Chassis Wiring Harness, Power, and Ground Connections.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  498    499    500    501    502  503  504    505    506    507    508  
img
.
TM 5-2420-231-23-2
0162
INSTALLATION CONTINUED
5. Install shuttle interlock timing relay (Figure 7, Item 6) in relay socket (Figure 7, Item 9).
6. Install hazard relay (Figure 7, Item 5) in relay socket (Figure 7, Item 4).
7. Install five relays (Figure 7, Item 7) in relay sockets (Figure 7, Item 8) on right side of bracket (Figure 7, Item 3).
8. Install eight relays (Figure 7, Item 1) in relay sockets (Figure 7, Item 2) on left side of bracket (Figure 7, Item 3).
Figure 7. Relays.
0162
9. Install front console wiring harness eyelet (Figure 8, Item 8) and nut (Figure 8, Item 6) on 12-V stud
(Figure 8, Item 7).
10. Install front console wiring harness eyelet (Figure 8, Item 4) and nut (Figure 8, Item 2) on 24-V stud
(Figure 8, Item 3).
11. Position two rubber boots (Figure 8, Items 1 and 5) over 12-V and 24-V studs (Figure 8, Item 7 and 3).
12. Install ground eyelet (Figure 8, Item 9), ground eyelet (Figure 8, Item 10), and bolt (Figure 8, Item 11) on cab.
13. Connect front console wiring harness connector (Figure 8, Item 14) to main chassis wiring harness connector
(Figure 8, Item 12) and tighten bolt (Figure 8, Item 13).
0162-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.