TM 5-2420-231-23-2
0162
REMOVAL CONTINUED
Figure 6. Relay Sockets.
0162
END OF TASK
CLEANING AND INSPECTION
0162
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0162
NOTE
Route wiring harness as noted during removal.
1. Install front console wiring harness (Figure 6, Item 8) on machine.
NOTE
Install tiedown straps in quantity and locations as noted during removal.
2. Install new tiedown straps (Figure 6, Item 7) on front console wiring harness (Figure 6, Item 8).
NOTE
Install relay sockets as tagged and marked during removal.
3. Install four bolts (Figure 6, Item 5), new locknuts (Figure 6, Item 6), and seven relay sockets (Figure 6, Item 4)
on machine.
4. Install five bolts (Figure 6, Item 2), new locknuts (Figure 6, Item 3), and eight relay sockets (Figure 6, Item 1) on
machine.