• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWERSHIFT WIRING HARNESS REPLACEMENT - Continued
Figure 2. Transmission Controller Wiring Harness.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  525    526    527    528    529  530  531    532    533    534    535  
img
. . .
4
TM 5-2420-231-23-2
0168
FIELD MAINTENANCE
-
TRANSMISSION CONTROLLER REPLACEMENT
016
8
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References - Continued
Tools and Special Tools
Tool Kit, General Mechanic's
WP 0374 (Group Number 0308)
0
0
(WP 0376, Item 117)
Equipment Conditions
Materials/Parts
Machine parked (TM 5-2420-231-10)
0
Rag, Wiping (WP 0375, Item 25)
Batteries disconnected (WP 0157)
0
0
References
Estimated Time to Complete
WP 0369
0.2 hr
0
0
WP 0370
0
REMOVAL
0168
1. Remove two screws (Figure 1, Item 1) and transmission controller (Figure 1, Item 2) from trim panel
(Figure 1, Item 3).
Figure 1. Transmission Controller.
0168
0168-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.