• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Pilot Control Valve.
JOYSTICK CONTROL VALVE REPAIR

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  291    292    293    294    295  296  297    298    299    300    301  
img
TM 5-2420-231-23-3
0265
INSTALLATION
0265
NOTE
Connect harness connectors as tagged and marked during removal.
1. Install pilot control on/off solenoid (Figure 1, Item 5) and new locknut (Figure 1, Item 7) on pilot control valve
(Figure 1, Item 4).
2. Install two pattern change solenoids (Figure 1, Item 1) and new locknuts (Figure 1, Item 2) on pilot control
valve (Figure 1, Item 4).
3. Connect harness connector (Figure 1, Item 6) to pilot control on/off solenoid (Figure 1, Item 5).
4. Connect two harness connectors (Figure 1, Item 3) to two pattern change solenoids (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASKS
0265
Connect batteries (WP 0157).
END OF TASK
END OF WORK PACKAGE
0265-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.