PILOT CONTROL ON/OFF AND PATTERN CHANGE SOLENOIDS REPLACEMENT
INSTALLATION

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  290    291    292    293    294  295  296    297    298    299    300  
img
. . .
TM 5-2420-231-23-3
0265
REMOVAL
0265
NOTE
Tag and mark harness connectors to aid in installation.
Pilot control tubes are removed for clarity in the figure.
1. Disconnect two harness connectors (Figure 1, Item 3) from two pattern change solenoids (Figure 1, Item 1).
2. Disconnect harness connector (Figure 1, Item 6) from pilot control on/off solenoid (Figure 1, Item 5).
3. Remove two locknuts (Figure 1, Item 2) and pattern change solenoids (Figure 1, Item 1) from pilot control valve
(Figure 1, Item 4). Discard locknuts.
4. Remove locknut (Figure 1, Item 7) and pilot control on/off solenoid (Figure 1, Item 5) from pilot control valve
(Figure 1, Item 4). Discard locknut.
Figure 1. Pilot Control Valve.
0265
END OF TASK
CLEANING AND INSPECTION
0265
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
0265-2