TM 5-2420-231-23-3
0283
INSTALLATION CONTINUED
10. Start machine and raise FEL (TM 5-2420-231-10).
11. Remove trestle (Figure 6, Item 1) from FEL.
12. Lower FEL to ground and shut off machine (TM 5-2420-231-10).
Figure 6. Trestle.
0283
END OF TASK
FOLLOW-ON TASKS
0283
1. Check hydraulic oil level (TM 5-2420-231-10).
2. Install front end loader bucket (TM 5-2420-231-10).
3. Grease tool quick-coupler assembly (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE