Figure 3. Support Stabilizer Arm.
Figure 2. Hose Brackets.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  543    544    545    546    547  548  549    550    551    552    553  
img
. . . . . . . . . . .
12
TM 5-2420-231-23-3
0291
FIELD MAINTENANCE
-
BACKHOE SWING TOWER CHASSIS REPLACEMENT
0291
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
Tool Kit, General Mechanic's
Two
0
0
(WP 0376, Item 117)
References
Pan, Drain, 5 gal. Capacity (WP 0376, Item 54)
0
TM 5-2420-231-10
Pliers, Retaining Ring, Fixed Tip, Convertible,
0
0
WP 0369
90/.090" Tips, 8-3/4" (WP 0376, Item 61)
0
WP 0374 (Group Number 0813)
Sling, Eye (Nylon, 4 ft x 1 in.)
0
0
(WP 0376, Item 79)
Equipment Conditions
Lifting Device (500-lb capacity)
0
Backhoe boom arm removed (WP 0292)
0
Materials/Parts
Estimated Time to Complete
Grease, Automotive and Artillery (GAA)
0
11.0 hr
0
(WP 0375, Item 14)
Rag, Wiping (WP 0375, Item 25)
0
REMOVAL
0291
1. Remove two retaining rings (Figure 1, Item 3), washers (Figure 1, Item 4), pin (Figure 1, Item 2), and boom
latch (Figure 1, Item 1) from backhoe swing tower chassis (Figure 1, Item 5). Position boom latch aside.
Figure 1. Boom Latch.
0291
0291-1