• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION MAIN REGULATOR VALVE REPAIR - Continued
Figure 2. Transmission Neutral Knockdown Valve Assembly.

Maintenance Manual For Loader, Scoop Type, Ded 4 X 4, Articulated Frame Steer, 4.5 To 5 Cu. Yd.
Page Navigation
  1090    1091    1092    1093    1094  1095  1096    1097    1098    1099    1100  
img
. . . . . . . . . .
2
TM 5-3805-255-14
0108
SUSTAINMENT MAINTENANCE
-
TRANSMISSION NEUTRAL KNOCKDOWN VALVE REPAIR
0108
Disassembly, Cleaning and Inspection, Assembly
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's, Automotive (WP
Machine parked on level ground (WP 0005)
0
0128, Item 20)
Parking brake applied (WP 0005)
0
0
Engine OFF (WP 0005)
Materials/Parts
0
0
Battery disconnect switch in OFF position (WP
Rag, Wiping (WP 0130, Item 28)
0004)
0
0
O-Ring (2)
Transmission neutral knockdown valve
0
removed
References
0
0
WP 0019
0
DISASSEMBLY
000108
1. Remove plug (Figure 1, Item 1), O-ring (Figure 1, Item 2), seal ring (Figure 1, Item 3), and valve spool (Figure
1, Item 4) from valve (Figure 1, Item 5). Discard O-ring.
2. Remove plug (Figure 1, Item 8), O-ring (Figure 1, Item 7), and spring (Figure 1, Item 6) from valve (Figure 1,
Item 5). Discard O-ring.
Figure 1. Transmission Neutral Knockdown Valve Disassembly.
0108
END OF TASK
0108-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.