TM 5-3805-258-24-2ENGINEDISASSEMBLY AND ASSEMBLYFUEL INJECTION PUMP HOUSING AND GOVERNOR7. Install tube assemblies (10) and (11) to theengine and the clip that holds them together.8. Connect wire assemblies (12) to the alter-nator.9. Connect wires (14) to the fuel shutoffsolenoid.10. Connect pressure line (13) to the fuel ratiocontrol.11. For Models 950BNS and 950BS:a) Connect bracket (16) to the governor.b) Connect cable assembly (15) to thegovernor control lever.12. For Models 950BNSCE and 950BSCE:a) Install housing (26), seal (27), and twoscrews (28).b) Turn governor shaft clockwise to offposition. Install lever (29) and two bush-ings (30), with lever approximately 350forward of vertical.c) Connect cable assembly (31) using washer(32) and screw (33).d) Install gasket (34), cover (35), and sixscrews (36).5-95
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business