POWER TRAIN
TM 5-3805-258-24-2
DISASSEMBLY AND ASSEMBLY
TORQUE CONVERTER
29. Install O-ring seals (42) in the carrier.
30. Install gear (43) on the shaft as shown.
31. Install retainer (45) and bolt (44) in the shaft.
Tighten the bolt to a torque of 110 ± 10 Nm
(80 ± 7 lb. ft.).
32. Install ring (46) in gear (47).
33. Use tool (B) to install bearing cups (48) in both
sides of the gear.
5-249