TM 5-3805-262-3413-1. ENGINE MAINTENANCE(CONT)(2)Detailed Procedure (Cont).INSTALLATION (SHEET 1 OF 6)(a)(b)(c)Remove plug from bottom oftorque converter housing.Rotate transmission flexplates to position onemounting hole directlyat bottom.Rotate engine flywheel toposition one mounting holedirectly at bottom.When using chain hoist to remove or install parts, be sure chain hoistis securely fastened to the part and that all slack in chain is takenup. Failure to do so could cause serious injury due to the part fallingon you.If you are injuredimmediately.(d) Connect lifting fixturecylinder head studs andCheck that all hoses, lines,by falling equipment, obtain medical aidand chain hoist to engine at front and reartake up all slack.and e-lectrical leads are clear as engineis lowered into loader.If neces-sary,reposition hoses, lines, orelectrical leads before installingengine.(e) Using chain hoist and liftingfixture, lower engine intoloader; move engine forwarduntil positioned againsttransmission torque converterhousing.(f) Insert one capscrew (9) withlock washer (10) throughflywheel housing opening.3-30
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business