TM 5-3805-262-343-21. CHECKS AND ADJUSTMENTS AND FLOWMETER TESTS (CONT)e. FlowmeterTests(Cont).TEST NO. 1 - HYDRAULIC PUMP LOADER SECTION (SHEET 2 OF 4)Hydraulic system pressure is over 2000 psi and hydraulic reservoir ispressurized with compressed air. Before loosening or disconnecting anyhydraulic hoses, lines, or fittings, operate all hydraulic controllevers to relieve hydraulic system pressure. Failure to do so couldcause serious injury or death.If you are injured obtain medicalassistance immediately.(2) Remove two nuts (4), lock washers (5), and capscrews (6). Remove twoclamps (7) securing inlet hose (3).3-628
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business