TM 5-3805-262-34
3-27. BUCKET CLAMSHELL Cylinder ASSEMBLIES MAlNTENANCE(CONT)
REASSEMBLY (SHEET 3 OF 3)
u.
v.
w.
x.
y.
z.
Screw gland (15) into cylinder tube (20). Do not tighten.
Push rod (6) farther into cylinder tube (20) using soft hammer or steel rod
inserted through rod (6) eye.
NOTE
If gland (15) has a plug (14) go to step w below. If gland (15) and
cylinder tube (20) use screw (1) go to step x if same gland is installed
that was removed or, if a new gland is installed go to step y.
Install gland (15) into cylinder tube until gland comes in contact with cylin-
der tube. Using spanner wrench, tighten gland to 200 to 300 lb-ft.
Tighten gland (15) to 100 to 200
lb-ft. Each half of hole for screw (1)
must be alined. Install screw (1). If
each half of hole is alined before 100
lb-ft torque, drill a new hole half in
gland and half in tube. Use number 26
drill bit and drill 5/16 inch deep.
Dont drill hole in same position as a
hole for spanner wrench. Install screw
(1).
Tighten gland (15) to 100 to 200
lb-ft. Drill a hole half in gland and
half in tube. Use number 26 drill bit
and drill 5/16 inch deep. Dont drill
hole in same position as a hole for
spanner wrench. Install screw (1).
Install bucket clamshell cylinder assemblies (refer to TM 5-3805-262-20).
3-750