• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERIES REPLACEMENT - CONTINUED
BATTERY BOXES REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  259    260    261    262    263  264  265    266    267    268    269  
img
. . . . . . . . . . . . .
4
TM 5-3805-290-23
BATTERY BOXES REPLACEMENT
0078 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Personnel Required
Maintenance Level
MOS 62B, Construction Equipment Repairer (2)
Unit
Equipment Conditions
Tools and Special Tools
Batteries removed from battery boxes (WP 0077
Tool kit, general mechanic's (Item 96, WP 0205 00)
00)
Shop equipment, common no. 1 (Item 77, WP 0205
Battery cables removed from battery boxes (WP
00)
0079 00)
Lifting equipment, 75-lb capacity
NATO slave receptacle removed from left battery
box (WP 0080 00)
Materials/Parts
Drawings Required
Cleaning compound, solvent, type III (Item 9, WP
TM 5-3805-290-23P, Figures 56 and 158
0206 00)
Rag, wiping (Item 41, WP 0206 00)
Estimated Time to Complete Task
3.5 hr
Cotter pin (2)
0078 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.