12
TM 5-3805-290-23-2
RIDE CONTROL ACCUMULATOR MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation, Testing and Charging
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Unit
O-ring
Tools and Special Tools
Personnel Required
MOS 62B, Construction Equipment Repairer
Shop equipment, common no. 1 (Item 77, WP 0205
References
Nitrogen gas charging system (Item 50, WP 0205
Equipment Conditions
Test stand, automotive (gage set) (Item 92, WP
Materials/Parts
Nitrogen technical dry cylinder (Item 30, WP 0206
Hydraulic system pressure relieved (TM 5-3805-
290-10)
Steering frame lock connected (TM 5-3805-290-
Oil, lubricating, OEA-30, Arctic (Item 32, WP
10)
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
Drawings Required
TM 5-3805-290-23P, Figure 134
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
Estimated Time to Complete Task
2.0 hr
WARN I N G
When servicing this machine, performing maintenance, or disposing of hazardous materials, consult your
unit/local hazardous waste disposal center or safety office for local regulatory guidance. If further informa-
tion is needed, please contact The Army Environmental Hotline at 1-800-872-3845.
DO NOT disconnect or remove any hydraulic system lines or fitting unless engine is shut down and hydraulic
system pressure has been relieved. Tighten all connections before applying pressure. Escaping hydraulic fluid
under pressure can penetrate the skin, causing injury to personnel.
At operating temperature, hydraulic oil is hot. Allow hydraulic oil to cool before removing any hydraulic fit-
ting. Failure to follow this warning may result in injury to personnel.
To prevent injury to personnel, wear protective eye covering and gloves.
Sudden movement of machine can cause injury to personnel on or near the machine.