• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ETHER STARTING AID REPLACEMENT - CONTINUED
ETHER STARTING AID REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1247    1248    1249    1250    1251  1252  1253    1254    1255    1256    1257  
img
TM 5-3805-291-23-1
ETHER STARTING AID REPLACEMENT - CONTINUED
0037 00
INSTALLATION - CONTINUED
N OT E
Hole in atomizer must be aligned parallel with center line of air flow and must be oriented against the
direction of the air flow. Use mark on hex head.
3.
Position atomizer assembly (11) and install two washers (21) and bolts (20) on machine.
4.
Connect chassis wiring harness (19) to atomizer assembly (11).
5.
Install new O-ring (18) and fitting (17) on machine.
6.
Install new sleeve (16) and nut (15) on fitting (17).
7.
Position line (5) on machine.
8.
Connect line (5) to nut (15).
9.
Install union (14) on line (5).
10.
Install line (13) on union (14).
11.
Install union (12) on line (13).
12.
Position line (4) on machine.
13.
Connect line (4) to union (12).
14.
Install new O-ring (10) and connector (9) on atomizer assembly (11).
427-C0332-1
0037 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.