• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ETHER STARTING AID REPLACEMENT - CONTINUED
FUEL PRIMING PUMP REPLACEMENT

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1248    1249    1250    1251    1252  1253  1254    1255    1256    1257    1258  
img
TM 5-3805-291-23-1
ETHER STARTING AID REPLACEMENT - CONTINUED
0037 00
INSTALLATION - CONTINUED
15.
Connect line (4) to connector (9).
16.
Install clip (8) on line (4).
17.
Install washer (7) and bolt (6) on machine.
18.
Install three clips (3) on lines (5 and 4).
19.
Install three washers (2) and bolts (1) on machine.
427-C0332-2
20.
Switch on machine (TM 5-3805-291-10).
21.
Install ether canister (TM 5-3805-291-10).
22.
Verify correct operation of machine only when temperature is below 32F (0C) (TM 5-3805-291-10).
END OF WORK PACKAGE
0037 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.