• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Hoses and Fittings.
Figure 4. Hammer Assembly.

Field Maintenance Manual For M400T And M400W
Page Navigation
  1093    1094    1095    1096    1097  1098  1099    1100    1101    1102    1103  
img
.
TM 5-3805-292-23
0169
DISASSEMBLY CONTINUED
Gas Valve Assembly
000169
4. Remove cap (Figure 3, Item 1) and O-ring (Figure 3, Item 2) from fitting (Figure 3, Item 5). Discard O-ring.
WARN I N G
Nitrogen must be discharged from hammer before removing gas valve assembly. Failure
to follow this warning can result in death or injury to personnel.
5. Discharge nitrogen from hammer. Refer to Nitrogen Discharging/Charging in this work package.
6. Remove fitting (Figure 3, Item 5) and O-ring (Figure 3, Item 6) from hammer (Figure 3, Item 7). Discard O-ring.
7. Remove spring (Figure 3, Item 3) and O-ring (Figure 3, Item 4) from hammer (Figure 3, Item 7). Discard O-ring.
Figure 3. Gas Valve Assembly.
0169
0169-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.