• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 26. Fuel Injection Pump Lock.
Figure 28. Crankshaft Timing Pin.

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  868    869    870    871    872  873  874    875    876    877    878  
img
.
TM 5-3805-298-23-2
0203
INSTALLATION CONTINUED
32. Remove camshaft timing pin (Figure 27, Item 2) from camshaft timing gear (Figure 27, Item 3) and engine.
33. Unlock crankshaft timing pin (Figure 27, Item 1).
34. Using a 1/2 drive ratchet and crankshaft turning tool (Figure 27, Item 4) turn engine in a slightly
counterclockwise rotation to release tension from crankshaft timing pin (Figure 27, Item 1).
Figure 27. Camshaft Timing Pin.
0203
0203-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.