TM 5-2420-231-23-1
0086
STEERING CONTROL VALVE TEST CONTINUED
6. Install plug (Figure 40, Item 1) on CF hose (Figure 40, Item 2).
Figure 40. CF Hose.
0086
7. Connect flowmeter hose (Figure 41, Item 4), tee 3/4-16M JIC X 3/4-16F JIC SW X 1-1/6-2M JIC (Figure 41,
Item 2), and cap (Figure 41, Item 3) to pump (Figure 41, Item 1).
Figure 41. Port CF Hose-to-Flowmeter Hose.
0086