• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Controller Connector.
Figure 13. Tiedown Straps.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  483    484    485    486    487  488  489    490    491    492    493  
img
.
TM 5-2420-231-23-2
0160
INSTALLATION CONTINUED
NOTE
Install wires as tagged and marked during removal.
18. Connect grid heater power cable (Figure 11, Item 3) and nut (Figure 11, Item 2) on grid heater
(Figure 11, Item 1).
Figure 11. Grid Heater.
0160
19. Connect grid heater power cable (Figure 12, Item 1) and install nut (Figure 12, Item 3) and washer (Figure 12,
Item 4) on relay (Figure 12, Item 2).
Figure 12. Relay.
0160
0160-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.