INSTALLATION CONTINUED
6. Install two front wheel and tire assemblies (Figure 9, Item 1), 16 washers (Figure 9, Item 3), and nuts
(Figure 9, Item 2) on machine.
Figure 9. Front Wheel and Tire Assemblies.
0209
END OF TASK
TOE-IN ADJUSTMENT
0209
1. Make sure both front tires are in straight-ahead position (TM 5-2420-231-10).
2. Mark a V (Figure 10, Item 1) on each front tire at center line of front axle (as measured from ground) at center
line of tread (Figure 10, Item 2).