4
TM 5-2420-231-23-3
FIELD MAINTENANCE
-
LOADER BUCKET CYLINDER ASSEMBLY REPLACEMENT
0270
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
Personnel Required
Tool Kit, General Mechanic's
Two
0
0
References
Pan, Drain, 5 gal. Capacity (WP 0376, Item 54)
0
Pliers, Retaining Ring, Fixed Tip, Convertible,
0
0
WP 0374 (Group Number 0705, 0737, and
0
0805)
Materials/Parts
Equipment Conditions
Cap Set, Protective, Dust and Moisture
0
0
Grease, Automotive and Artillery (GAA)
Estimated Time to Complete
0
4.0 hr
0
0
0
O-ring (2)
0
WARNING
Allow hydraulic system to cool before performing procedure. Hot metal parts can cause
severe burns. Wear eye, hand, and skin protection when working with heated parts.
Hydraulic oil is very slippery. Immediately wipe up any spills.
Failure to follow these warnings may result in injury or death to personnel.
CAUTION
Plug and cap all hoses and fittings to prevent contamination. Failure to follow this caution
may result in damage to the machine.
NOTE
Tag and mark lines to aid in installation.
The procedure for loader cylinder removal and replacement is identical for left-hand and
right-hand loader cylinder. Left-hand loader cylinder is shown in this procedure.
0270-1