22
TM 5-2420-231-23-3
FIELD MAINTENANCE
-
LOADER LIFT AND BUCKET CONTROL LEVER ASSEMBLY REPAIR
0
277
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
References
Tools and Special Tools
Tool Kit, General Mechanic's
TM 10-2420-231-10
0
0
0
Pliers, Retaining Ring, Fixed Tip, Convertible,
0
0
0
Materials/Parts
Equipment Conditions
0
0
Instrument panel front right-side cover removed
0
0
(WP 0176)
0
0
Estimated Time to Complete
Cotter Pin (6)
0
3.5 hr
Locknut (2)
0
0
Pushnut
0
Retaining Ring
0
REMOVAL
0277
NOTE
Tag and mark wires to aid in installation.
1. Disconnect electrical connector (Figure 1, Item 1) from harness (Figure 1, Item 2).
Figure 1. Electrical Connector.
0277