OPERATOR’S STATIONINSTRUMENTTM 5-3805-258-24-2DISASSEMBLY AND ASSEMBLYPANEL3. Install the start switch as follows:a) Connect the five wires to the back of switch(3).b) Install switch (3) from the back of thepanel.c) Install nut (4) to hold the switch.4. Install the service meter as follows:a) Put service meter (5) in position in thepanel.b) Install bracket (6) and the two wing nuts tohold the meter in position.c) Connect wires (8) to wiring harness (7).5. Install panel test switch as follows:a) Connect the wires to switch (12).b) Install switch (12) from the back of thepanel. Install the nut to hold the switch.5-499
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business