TM 5-3805-262-20
12-3. LOADER BUCKET ASSEMBLY MAINTENANCE
a. Loader Bucket Assembly.
This task covers removal and replacement of loader
bucket assembly.
TOOLS: No. 1 Common Organizational Maintenance Tool Kit
Combination box and open end wrench set
Socket wrench set, 3/8 inch drive
L u b r i c a t i n g k it
Hand hammer, three pounds
Chain hoist, 3 ton capacity
Rod 1-7/8 inches diameter by 12 inches long
PERSONNEL REQUIRED: Two Construction Equipment Mechanics M0S 62B
REFERENCES: LO 5-3805-262-12
PRELIMINARY PROCEDURE:
NOTE
Loader bucket assembly lines and fittings removed
(page 11-32) and bucket clam cylinder assemblies removed (page 11-72).
REMOVAL (SHEET 1 OF 3)
( 1 ) A t e i t h e r l e f t o r r i g h t s i d e o f l o a d er
( 1 ) .
, remove two lubrication fittings
12-20