TM 5-3805-262-343-30. BUCKET LIFT ARMS AND PIVOT ASSEMBLIES MAINTENANCE (CONT)a. BucketLiftArms(Cont).REASSEMBLY (SHEET 2 OF 2)(14) Position link (13) on bellcrank assembly (24) and align(12) in its hole using hammer. Be sure capscrew hole inholes. Start pinpin is alinedwith associated hole in bellcrank assembly. Install shims (14) on bothsides of link. Continue driving pin until capscrew hole in pin and bell-crank assembly are alined.(15) Install capscrew (11) and new locknut (10). Tighten locknut (10) se-curely.(16) Install lubrication fitting (9) in pin (12).(17) Repeat steps (14) through (16) above to install remaining link (13) onopposite bellcrank assembly.INSTALLATION (SHEET 1 OF 2)(1)(2)(3)(4)(5)Attach chain hoist to bucket lift arm and raise bucket lift arm to properheight for installation.Start engine and operate at idle speed.Slowly and carefully move loader forward until holes in front chassis arealined with holes in bucket lift arm. Raise or lower bucket lift arm us-ing chain hoist, as necessary.Put thrust washer (8) on pin (7).Using hammer, drive pin (7) through bucket lift arm and into associatedhole in front chassis.3-772
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business