26
TM 5-3805-298-23-2
FIELD MAINTENANCE
-
PREPARATION FOR TRANSPORT
0175
Roading Machine (Self-Deployment), Highway and Rail Transport, Marine Transport, Air Transport,
Counterweight Removal Tool Assembly, Counterweight Removal Tool Disassembly, Counterweight
Removal, Counterweight Installation
INITIAL SETUP
Tools and Special Tools - Continued
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Lifting Device (2,000 lb capacity)
0
(WP 0431, Item 162)
0
Materials/Parts
0
Adapter (part of Counterweight Removal Tool)
Ear Plugs (WP 0430, Item 11)
(WP 0431, Item 1) (3)
0
0
Rag, Wiping (WP 0430, Item 27)
Bolt, Machine (M10 x 1.5 x 70 mm)
0
Tag, Marker (WP 0430, Item 35)
(WP 0431, Item 19) (2)
0
0
Bracket, Link (part of Counterweight Removal
Tape, Duct (WP 0430, Item 37)
0
Tool) (WP 0431, Item 22) (2)
Tiedown Strap, Electrical Components
0
Gauge (Air) (WP 0431, Item 54)
(WP 0430, Item 40)
0
0
Handle, 3/4" Drive, 19-1/4" Long, w/Lock But-
Personnel Required
0
ton (WP 0431, Item 66)
0
Two 91L
Nut (part of Counterweight Removal Tool)
0
12N
(WP 0431, Item 88) (2)
0
0
Pin, Lock (part of Counterweight Removal
References
0
Tool) (WP 0431, Item 91) (2)
0
FM 55-30
0
Sling, Nylon (WP 0431, Item 109) (2)
0
0
Socket, Impact, 3/4" Drive, 6 Point, 19 mm
WP 0344
(WP 0431, Item 131)
0
0
Socket, Impact, 3/4" Drive, 6 Point, Deep,
Equipment Conditions
0
Thin Wall, 1 7/16" (WP 0431, Item 134)
0
Machine parked (TM 5-3805-298-10)
0
Tube, Extension (part of Counterweight
Estimated Time to Complete
Removal Tool) (WP 0431, Item 166) (4)
0
0
Washer (part of Counterweight Removal Tool)
8 Hr
0
(WP 0431, Item 169) (4)
0
0175-1