Figure 7. Valve Adjustment.
INTAKE MANIFOLD AND GRID HEATER ASSEMBLY REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  226    227    228    229    230  231  232    233    234    235    236  
img
. . .
TM 5-2420-231-23-2
0113
ADJUSTMENT CONTINUED
13. Remove two starter bolts (Figure 8, Item 1) and engine turning tool (Figure 8, Item 2) from flywheel housing
(Figure 8, Item 3).
Figure 8. Engine Turning Tool.
0113
END OF TASK
FOLLOW-ON TASKS
0113
1. Install starter (WP 0152).
2. Install valve covers (WP 0112).
END OF TASK
END OF WORK PACKAGE