• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ADJUSTMENT CONTINUED
LOADER LIFT FRAME REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  433    434    435    436    437  438  439    440    441    442    443  
img
. . .
TM 5-2420-231-23-3
0278
ADJUSTMENT CONTINUED
Figure 33. Load Leveler Cable Adjustment.
0278
END OF TASK
FOLLOW-ON TASKS
0278
1. Install mud guard (WP 0307).
2. Install front floor plate (WP 0306).
3. Install instrument panel right-side front cover (WP 0176).
4. Grease loader arm (TM 5-2420-231-10).
5. Check hydraulic fluid (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE
0278-29/(30 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.