10
TM 5-2420-231-23-3
FIELD MAINTENANCE
-
LOADER LIFT FRAME REPLACEMENT
0279
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
Tool Kit, General Mechanic's
Lockwasher (9)
0
0
Personnel Required
0
Three
Crowbar, Pinch, Heavy Duty, 59"
0
0
References
Pan, Drain, 5 gal. Capacity (WP 0376, Item 54)
0
0
Pliers, Retaining Ring, Fixed Tip, Convertible,
0
0
0
Sledge, Double Face Hammer, 8-lb
0
Equipment Conditions
Sling, Nylon, 6 ft x 1 in. (WP 0376, Item 81) (2)
Tool quick-coupler assembly removed
0
0
0
Loader bucket cylinder assembly removed
Suitable Lifting Device (1,000-lb capacity)
0
0
Materials/Parts
Loader lift cylinder assembly removed
0
Grease, Automotive and Artillery (GAA)
0
Estimated Time to Complete
0
11.4 hr
Cotter Pin
0
0
Cribbing
0
0279-1