OPERATORS STATION
INSTALL HYDRAULIC CONTROL
GROUP
1.
2.
3.
4.
5.
6.
7.
TM 5-3805-258-24-2
DISASSEMBLY AND ASSEMBLY
HYDRAULIC CONTROL GROUP
Fasten a hoist and put control
position over the pilot valve(s).
5083-12
group (1) in
Install the two bolts to hold control group (1)
in the temporary storage position.
Move pilot valve(s) (4) in position and install
the bolts and nuts to hold brackets (2) and
(3) to the control group.
Connect the control linkages and levers (5)
to the control shafts of the pilot valve(s).
Connect hose assemblies (6) and (8) to the
bottom of the pilot valve(s). Connect wiring
harness (7) to the solenoid wiring and install
the bracket to hold the connection together.
Connect springs (9) to the bracket assembly
and control linkage.
See HYDRAULIC CONTROL LEVER
LINKAGE ADJUSTMENT in SPECIFICA-
TIONS or TESTING AND ADJUSTING
section for the correct adjustment of the hy-
draulic control group.
end by:
a) install cab and platform
5-521