OPERATOR’S STATIONINSTALL HYDRAULIC CONTROLGROUP1.2.3.4.5.6.7.TM 5-3805-258-24-2DISASSEMBLY AND ASSEMBLYHYDRAULIC CONTROL GROUPFasten a hoist and put controlposition over the pilot valve(s).5083-12group (1) inInstall the two bolts to hold control group (1)in the temporary storage position.Move pilot valve(s) (4) in position and installthe bolts and nuts to hold brackets (2) and(3) to the control group.Connect the control linkages and levers (5)to the control shafts of the pilot valve(s).Connect hose assemblies (6) and (8) to thebottom of the pilot valve(s). Connect wiringharness (7) to the solenoid wiring and installthe bracket to hold the connection together.Connect springs (9) to the bracket assemblyand control linkage.See HYDRAULIC CONTROL LEVERLINKAGE ADJUSTMENT in SPECIFICA-TIONS or TESTING AND ADJUSTINGsection for the correct adjustment of the hy-draulic control group.end by:a) install cab and platform5-521
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business