Figure 7. Tandem Pump.
AXLE MAINTENANCE

Field Maintenance Manual For M400T And M400W
Page Navigation
  482    483    484    485    486  487  488    489    490    491    492  
img
. . . . . . .
TM 5-3805-292-23
0068
INSTALLATION CONTINUED
10. Connect lines (Figure 8, Items 4 and 8) to tandem pump (Figure 8, Item 6) and tighten clamps (Figure 8, Items
3 and 7).
11. Connect four lines (Figure 8, Item 5) to tandem pump (Figure 8, item 6).
N OT E
One line is connected on bottom of tandem pump.
12. Connect five lines (Figure 8, item 2) to tandem pump (Figure 8, item 6).
13. Connect line (Figure 8, Item 1) to tandem pump (Figure 8, Item 6).
Figure 8. Tandem Pump.
0068
END OF TASK
FOLLOW-ON TASKS
00068
1. Install powertrain lines and fittings (WP 0063).
2. Install gear pump (WP 0088).
3. Install hydraulic oil temperature sender (WP 0162).
4. Install backup alarm pressure switch (WP 0140).
5. Install seat (WP 0126).
6. Fill hydraulic system (WP 0009).
7. Verify correct operation of machine (TM 5-3805-292-10).
END OF TASK
END OF WORK PACKAGE
0068-10